UNSRAT Repository

Analisa Rugi – Rugi Daya Pada Jaringan Distribusi Tenaga Listrik Kotamobagu Dan Perbaikan

Sudiro, Rahmat Alfath and Patras, Lily S. and Mangindaan, Glanny M. Ch (2020) Analisa Rugi – Rugi Daya Pada Jaringan Distribusi Tenaga Listrik Kotamobagu Dan Perbaikan. -.

[img]
Preview
PDF (Skripsi)
Download (816kB) | Preview

Abstract

Abstrak— Penggunaan energi listrik saat ini telah meningkat dengan pesat, baik dalam kawasan industri, dan dunia pendidikan maupun untuk keperluan rumah tangga. Sehingga perkembangan di PLN cabang Kotamoabagu sebagai pusat pengembangan wilayah Kotamobagu Provinsi Sulawesi Utara kini semakin pesat seiring dengan meningkatnya gaya hidup masyarakat dan maraknya pusat pembangunan dan pusat kegiatan publik di kotamobagu sampai saat ini sehingga mengakibatkan meningkatnya kebutuhan masyarakat akan energi listrik. Perhitungan Peramalan Beban dikotamobagu di tahun 2030 mencapai 139.72 MW dan Perhitungan jatuh tegangan untuk penyulang OK 4 ke G.H Doloduo di beberapa section/bagian diperoleh hasil yang cukup besar dan tidak memenuhi standart yang ditentukan oleh PLN yaitu jatuh tegangan tidak boleh lebih dari 10%. Untuk itu diperlukan penanganan secepatnya untuk mengantisipasi pertumbuhan beban yang semakin tinggi. Kata kunci: Distribusi, Peramalan, Jatuh Tegangan, Tegangan Menengah. Abstract - The use of electrical energy is currently increasing rapidly, both in industrial estates and in education as well as for household purposes. So that the development at the PLN Kotamoabagu branch as the center for the development of the Kotamobagu area of North Sulawesi Province is now increasingly rapid along with the increasing lifestyle of the community and the proliferation of development centers and public activity centers in Kotamobagu, resulting in increased community demand for electrical energy. The calculation of dichotamobagged load forecasting in 2030 reaches 139.72 MW and the calculation of the voltage drop for the OK 4 feeder to G.H Doloduo in several sections / sections obtained results that are quite large and do not meet the standards set by PLN, namely the voltage drop should not be more than 10%. For this reason, handling is needed as soon as possible to anticipate higher load growth. Keywords : Distribution, Forecasting, Voltage Drop, Medium Voltage.

Item Type: Other
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: Mr. Benhard W. Tampangela, ST
Date Deposited: 19 Oct 2020 06:30
Last Modified: 19 Oct 2020 06:30
URI: http://repo.unsrat.ac.id/id/eprint/2767

Actions (login required)

View Item View Item