Analisa Pengaruh Perubahan Beban terhadap Efisiensi Generator Sinkron 3 Fasa di PLTP Lahendong Unit 3

Manangka, Rian and Mangindaan, Glanny M. Ch and Tumaliang, Hans (2022) Analisa Pengaruh Perubahan Beban terhadap Efisiensi Generator Sinkron 3 Fasa di PLTP Lahendong Unit 3. -.

[img]
Preview
PDF (Skripsi)
Download (587kB) | Preview

Abstract

Abstrak— PLTP merupakan unit pembangkit terbesar dengan energi yang ramah lingkungan berbasiskan sumber daya panas bumi. PLTP Lahendong unit 3 merupakan unit pembangkit yang terletak di kota Tomohon Sulawesi Utara yang mampu membangkitkan energi listrik sebesar 20 MW. Salah satu komponen penting dalam sistem PLTP adalah generator. Ada banyak masalah yang dapat mempengaruhi kerja generator contohnya menurunnya efisiensi generator. Menurunnya efisiensi dapat mempengaruhi energi listrik yang di alirkan tidak maksimal akibat rugi-rugi generator. Oleh karena itu perlu dilakukan analisa terhadap efisiensi generator apakah generator masih dalam keadaan optimal atau kurang optimal. Hasil dari analisa dengan mengambil data pada tanggal 1 bulan Mei 2021 selama 1 bulan didapatkan hasil perhitungan yang kemudian dianalisis bahwa nilai beban yang paling rendah yang dihasilkan generator adalah 12 MW dengan efisiensi generator 56% dan nilai beban yang paling tinggi adalah 19 MW dengan efisiensi 88%. %. Hal ini menunjukkan bawah nilai beban yang dihasilkan generator berpengaruh terhadap efisiensi generator. Kata Kunci : Generator, Efisiensi, PLTP Absrtact—PLTP is the largest generating unit with environmentally friendly energy based on geothermal resources. PLTP Lahendong unit 3 is a generating unit located in the city of Tomohon, North Sulawesi, which is capable of generating 20 MW of electrical energy. One of the important components in a geothermal power plant system is a generator. There are many problems that can affect the work of the generator, for example, decreasing the efficiency of the generator. Decreasing efficiency can affect the electrical energy that is flowed not optimally due to generator losses. Therefore, it is necessary to analyze the efficiency of the generator whether the generator is still in optimal or less than optimal condition. The results of the analysis by taking data on May 1, 2021 for 1 month obtained the calculation results which were then analyzed that the lowest load value produced by the generator was 12 MW with generator efficiency of 56% and the highest load value was 19 MW with efficiency of 88 %. %. This shows that the value of the load generated by the generator affects the efficiency of the generator. Keywords: Generator, Efficiency, PLTP

Item Type: Other
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: Mr. Benhard W. Tampangela, ST
Date Deposited: 12 Jul 2022 07:42
Last Modified: 12 Jul 2022 07:42
URI: http://repo.unsrat.ac.id/id/eprint/3955

Actions (login required)

View Item View Item