PERENCANAAN JARINGAN DISTRIBUSI SEKUNDER di PERUMAHAN GPI PANIKI

Lumiu, Fransisko and Tumaliang, Hans and Similang, Sartje (2022) PERENCANAAN JARINGAN DISTRIBUSI SEKUNDER di PERUMAHAN GPI PANIKI. -.

[img]
Preview
PDF (Skripsi)
Download (781kB) | Preview

Abstract

Abstrak— Perencanaan kebutuhan jaringan sekunder untuk sebuah kompleks perumahan adalah penting dengan memperhatikan beban perumahan. Perencanaan diperlukan sebab berkaitan dengan tujuan pengembangan agar mengetahui pertumbuhan energi yang ada di perumahan . Perumahan GPI Paniki merupakan salah satu perumahan yang cukup besar yang berada di kota Manado, dengan jumlah pelanggan PLN ( Persero ) kurang lebih 6000 kWh yang terpasang. Untuk mendapatkan beban yang seimbang di tiap transformator maka di lakukan perencanaan jaringan sistem distribusi sekunder. Untuk mengetahui kinerja dari transformator itu sendiri. Efisiensi pemakaian transformator berada pada saat transformator memiliki beban 50 % - 80%. GPI Paniki memiliki 36 ( tiga pulu enam) unit transformator distribusi dengan masing-masing kapasitas sebesar 200 kVA ( 6 ) unit, 150 kVA ( 7 ) unit, 100 kVA ( 18 ) unit, dan 50 kVA ( 7 ) unit. Transformator yang berada di perumahan GPI Paniki rata-rata hanya memiliki beban di bawah 50% dikarenakan arus pada tiap fasa masih kurang karena banyak rumah yang belum di tinggali. Kata kunci : transformator , kapasitas transformator, efisiensi trasnformator , arus Beban seimbang, perumahan GPI Paniki. Abstract— Planning the secondary network requirements for a housing complex is important by taking into account the housing load. Planning is needed because it relates to the development objectives in order to know the energy growth in housing. GPI Paniki housing is one of the large housing estates in Manado city, with a total of approximately 6000 kWh of installed PLN (Persero) customers. To get a balanced load on each transformer, a secondary distribution system network planning is carried out. To know the performance of the transformer itself. The efficiency of using the transformer is when the transformer has a load of 50% - 80%. GPI Paniki has 36 (thirty six) units of distribution transformer with each capacity of 200 kVA (6) units, 150 kVA (7) units, 100 kVA (18) units, and 50 kVA (7) units. The transformer in the Paniki GPI housing on average only has a load below 50% because the current in each phase is still lacking because many houses are not yet occupied. Keywords: transformer, transformer capacity, transformer efficiency, curren Load balanced, GPI Paniki housing.

Item Type: Other
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: UNSPECIFIED
Depositing User: Mr. Benhard W. Tampangela, ST
Date Deposited: 15 Jul 2022 07:22
Last Modified: 15 Jul 2022 07:22
URI: http://repo.unsrat.ac.id/id/eprint/3958

Actions (login required)

View Item View Item