Analisis Terjadi Overload Transformator Pada Saluran Distribusi Di PT.PLN (Persero) ULP Bitung.
-.
Abstract
Abstract — In the Bitung city area, there are many industries that are growing, starting from factories, offices, ports and others. Where electricity in the city of Bitung must have a lot of disturbances, especially disturbances at distribution substations caused by distribution transformers, namely overload or overload. The purpose of this study was to determine the cause of the occurrence of overload disturbances in the city of Bitung and losses in transformers that occurred overload. From the calculation results, most of the loading at night where the location of the substation is mostly located in residential areas. This is due to household use at night. There are also power losses that occur in overloaded transformers during the day as much as 20,346.99 Watts and 41,828.92 Watts at night.
Keywords : Losses, Overload, Transformator, Distrubance.
Abstrak — Pada daerah kota bitung terdapat banyak perindustrian yang tumbuh mulai dari pabrik-pabrik, kantor, pelabuhan dan lain-lain. Dimana kelistrikan di kota bitung pasti banyak terjadi ganggaun, khususnya gangguan pada gardu distrribusi yang disebabkan oleh transformator distribusi yaitu overload atau beban lebih. Tujuan dari penelitian ini adalah untuk mengetahui penyebab terjadinya gangguan overload pada kota bitung dan rugi-rugi pada transformator yang terjadi overload. Dari hasil perhitungan pembebanan paling banyak pada malam hari dimana lo,kasi gardu sebagian besar terletak di daerah permukiman. Hal ini dikarenakan pemakaian pada rumah tangga pada malam hari. Terdapat juga rugi-rugi daya yang terjadi pada transformator yang overload pada siang hari sebanyak 20.346,99 Watt dan pada malam hari 41.828,92 Watt.
Kata kunci — Rugi-rugi, Beban Lebih, Transformator, Gangguan.
Actions (login required)
|
View Item |