Bayang, Eduard Novi and Mangindaan, Glanny M. Ch and Tumaliang, Hans
(2020)
Perencanaan Instalasi Listrik Di Stadion
Parasamya Tomohon Berstandar Internasional.
-.
Abstract
ABSTRACT-Electrical energy for the people today is very
much needed in line with daily activities and technological
advances. Lighting is an important factor in building and
room design, it is useful for supporting comfort in activities
and safety in the event of an emergency. Lighting is divided
into two types, namely natural lighting using sunlight and
artificial lighting using artificial light (lamps). The
installation planning at ParasamnyaTomohon Stadium uses 4
tower points, with each tower using 30 lamps, a total of 120
lamps. With the estimated total power of the building, phase R
is 891319 watts, S phase 888833 watts, T phase 875775 watts,
a total of 2655927 watts.
Keywords: Electrical energy, Installation,
ParasamyaTomohon Stadium, Power Estimation
Abstrak - Energi listrik bagi masyarakat sekarang ini sangat
dibutuhkan sejalan dengan aktifita ssehari–hari dan
kemajuan teknologi.Pencahayaan merupakan salah satu
factor penting dalam perancangan bangunan maupun
ruangan, hal ini berguna untuk menunjang kenyamanan
dalam beraktivitas dan keselamatan jika terjadi keadaan
darurat.Pencahayaan dibagi menjadi dua jenis yaitu
pencahayaan alami dengan memanfaatkan sinar matahari
dan pencahayaan buatan yang menggunakan cahaya buatan
(lampu).Perencanaan Instalasi Di Stadion Parasamnya
Tomohon ini menggunakan 4 titik tower, dengan masing2
tower menggunakan 30 buahlampu, total lampu
120.Denganestimasidaya total keseluruhanbangunanfasa R
891319 watt, fasa S 888833 watt, fasa T 875775 watt, total
2655927 watt.
Kata Kunci :Energi listrik, Instalasi ,Stadion Parasamya
Tomohon , Estimasi Daya
Actions (login required)
|
View Item |