UNSRAT Repository

Evaluasi Keandalan Sistem Distribusi Tenagalistrik Berdasarkan Mutu Pelayanan PT.PLN ( Persero ) Jailolo. Kabupaten Halmahera Barat

Goro, David C. and Similang, Sartje and Tumaliang, Hans (2022) Evaluasi Keandalan Sistem Distribusi Tenagalistrik Berdasarkan Mutu Pelayanan PT.PLN ( Persero ) Jailolo. Kabupaten Halmahera Barat. -.

[img]
Preview
PDF (Skripsi)
Download (734kB) | Preview

Abstract

Abstrack The need for electricity from year to year is increasing, followed by an increase in people's living standards. With the increasing importance of electricity needs for the community, the level of continuity of distribution of electrical energy is considered very important. The level of reliability can be seen from the size of the SAIDI and SAIFi values. System Avarage Interruption Duration Index (SAIDI) is the average duration of interruptions, System Avarage Interruptio Frequency Index (SAIFI) is the average frequency of interruptions. From the data obtained based on the calculation of the reliability index of SAIDI and SAIFI in Jailolo West Halmahera in 2017, SAIDI value : 32,475 in hours/year 2017, SAIFI value : 114,219 outages/year 2017. The most disturbance was found in PT PLN (Persero) Jailolo West Halmahera are momentary/undetected and external disturbances. Evaluation is by conducting more routine elections so that this kind of disturbance no longer occurs Kata Kunci : SAIDI and SAIFI reliability

Item Type: Other
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Teknik Elektro
Depositing User: Mr. Benhard W. Tampangela, ST
Date Deposited: 20 May 2022 06:00
Last Modified: 20 May 2022 06:00
URI: http://repo.unsrat.ac.id/id/eprint/3859

Actions (login required)

View Item View Item